• page banner

Steel Pontoon Bridge with high standard quality

Short Description:


Product Detail

Product Tags

Product features

1.No need to make bridge piers
2.interchangeable,
3.Detachable
4.long life

Steel pontoon bridge (2)

Product advantages

1.Simple erection and fast
2.high safety
3.strong endurance
4.good stability
5.beautiful appearance
6.wide application
7.Can be customized according to needs

Steel pontoon bridge (1)

Product application

It is widely used in the military transportation,emergency earthquake and flooding relief work and road,bridge,railways construction,etc.

Specification

Product name: Steel pontoon bridge
nickname: Prefabricated floating bridge; prefabricated highway steel bridge, steel temporary bridge, steel trestle bridge; temporary access road; temporary temporary bridge; Bailey bridge;
model: 321 type; 200 type; GW D type;
Commonly used truss piece model: 321 type Bailey panel, 200 type Bailey panel; GW D type Bailey panel, etc.
The largest single span of steel bridge design: Around 60 meters
Standard lane width of steel bridge: Single lane 4 meters; double lane 7.35 meters; design according to requirements.
Load class: Class 10 for automobiles; Class 15 for automobiles; Class 20 for automobiles; Class 50 for crawlers; Class 80 for trailers; 40 tons for bicycles;
AASHTO HS20, HS25-44, HL93, BS5400 HA + HB; City-A; City-B; Highway-I; Highway-II; Indian standard Class-40; Australian standard T44; Korean standard D24, etc.
Design: According to the difference of span and load, choose the appropriate platoon and pontoon scheme.
Main material of steel bridge: GB Q345B
Connection pin material: 30CrMnTi
Connecting bolt grade: 8.8 grade high-strength bolts; 10.9 grade high-strength bolts.
Surface corrosion: Hot-dip galvanizing; paint; heavy-duty anticorrosive paint for steel structure; asphalt paint; anti-skid aggregate treatment of bridge deck, etc.
Bridge erection method: Hoisting method; floating method, etc.
Installation takes time: 30-60 sunny days after abutment and other conditions are met (determined according to bridge length and site conditions)
Installation requires workers: 15-20 people (determined according to site conditions)
Equipment required for installation: Cranes, hoists, jacks, chain hoists, welders, generators, etc. (Can be adjusted according to site conditions)
Steel bridge features: No need to make bridge piers, interchangeable, detachable, long life
Pass the certification: ISO, CCIC, BV, SGS, CNAS, etc.
Executive standard: JT-T/728-2008
manufacturer: Zhenjiang Great Wall Heavy Industry Technology Co., Ltd.
Annual output: 12000 tons

  • Previous:
  • Next: