China Professional China The Bailey Bridge Ladakh - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall factory and manufacturers | Great Wall
  • page banner

Professional China The Bailey Bridge Ladakh - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our firm since its inception, normally regards item top quality as company life, constantly make improvements to generation technology, improve product excellent and repeatedly strengthen organization total good quality management, in strict accordance with the national standard ISO 9001:2000 for Bailey Bridge Video, Bailey Bridge Walton On Trent, Bailey Bridge Rental, Your support is our eternal power! Warmly welcome customers at home and abroad to visit our company.
Professional China The Bailey Bridge Ladakh - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall Detail:

Specification

Product name: Compact-100 Bailey Bridge
Model alias:  321-type prefabricated highway steel bridge (Bailey Bridge)
Derivative models: CB100, Compact-100, British 321-Type Bailey Bridge.
Truss piece model: Type 321 Bailey Panel
Conventional size of truss piece: 3 meters × 1.4 meters (hole to hole) usually also said: 3 meters X 1.5 meters (side to side)
Maximum span of steel bridge design: 51-meter single-span (if the total length is greater than 51 meters, it can be used as a multi-span continuous beam, and 200-type, GWD-type steel bridge can also be selected)
Standard lane width of steel bridge: 4.2 meters single lane (also can be customized according to customer needs)
Load class: Class 10 for automobiles; Class 15 for automobiles; Class 20 for automobiles; Class 50 for crawlers; Class 80 for trailers; 40 tons for bicycles;
AASHTO HS20, HS25-44, HL93, BS5400 HA + HB; City-A; City-B; Highway-I; Highway-II; Indian standard Class-40; Australian standard T44; Korean standard D24, etc.
Design: 321 type SS, SSR, DS, DSR, TS, TSR, DD, DDR, TD, TDR
According to the difference of span and load, select the appropriate row. Contact us for free design.
Main material of steel bridge: GB Q345B
Connection pin material: 30CrMnTi
Connecting bolt grade: 8.8 high-strength bolts
Surface corrosion: Hot-dip galvanizing; paint; heavy-duty anticorrosive paint for steel structure; asphalt paint; anti-skid aggregate treatment of bridge deck, etc.
Bridge erection method: Cantilever push-out method; hoisting method; floating method; in-situ assembly method; soil pile construction method, etc.
Installation takes time: 7-14 sunny days after the abutment and other conditions are met (determined according to the length of the bridge and site conditions)
Installation requires workers: 6-8 (determined according to site conditions)
Equipment required for installation: Cranes, hoists, jacks, chain hoists, etc. (Can be adjusted according to site conditions)
Steel bridge features: Short delivery time, light fittings, fast assembly, interchangeable, detachable, long life
Pass the certification: ISO, CCIC, BV, SGS, CNAS, etc.
Executive standard: JT-T/728-2008
manufacturer: Zhenjiang Great Wall Heavy Industry Technology Co., Ltd.
Annual output: 12000 tons

Product elements introduction

It consists of Chord member, Montant Diagonal rod.
1. Panel Bridge
2. Factory provided directly
3. Manual handling
bailey bridge panel consists of panels, pins, post end, bolt, chord reinforcement, truss bolt and chord bolt.

Product application

The early Compact-100 Bailey Bridge was mainly used in the military, that is, military steel bridge. Now Compact-100 Bailey Bridge has been widely used in rescue and disaster relief, traffic engineering, municipal water conservancy engineering, dangerous bridge reinforcement, etc. in addition to being a war-ready steel bridge.

Product advantages


Product detail pictures:

Professional China The Bailey Bridge Ladakh - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall detail pictures

Professional China The Bailey Bridge Ladakh - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall detail pictures

Professional China The Bailey Bridge Ladakh - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall detail pictures


Related Product Guide:

We insist on the principle of development of 'High quality, Efficiency, Sincerity and Down-to-earth working approach' to provide you with excellent service of processing for Professional China The Bailey Bridge Ladakh - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall , The product will supply to all over the world, such as: Costa rica, Finland, UK, With the development and enlargement of mass clients abroad, now we have set up cooperative relationships with many major brands. We have our own factory and also have many reliable and well-cooperated factories in the field. Adhering to the "quality first, customer first, We are provideing high-quality, low-cost products and first-class service to customers. We sincerely hope to establish business relationship with customers from all over the world on the basis of quality, mutually benefit. We welcome OEM projects and designs.
  • The factory workers have a good team spirit, so we received high quality products fast, in addition, the price is also appropriate, this is a very good and reliable Chinese manufacturers.
    5 Stars By Edwina from Mozambique - 2017.06.22 12:49
    This is a very professional and honest Chinese supplier, from now on we fell in love with the Chinese manufacturing.
    5 Stars By Priscilla from Croatia - 2017.08.18 18:38