• page banner

New Fashion Design for Compact 200 Bailey Bridge - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

With the "Client-Oriented" business philosophy, a rigorous quality control system, advanced manufacturing equipment and a strong R&D team, we always provide high quality products, excellent services and competitive prices for Steel Cantilever Bridge, Metal Bridges, Steel Portable Bridge, Quality is factory's lifestyle , Focus on customers' demand could be the source of corporation survival and advancement, We adhere to honesty and great faith operating attitude, looking ahead on your coming !
New Fashion Design for Compact 200 Bailey Bridge - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall Detail:

Specification

Product name: Compact-100 Bailey Bridge
Model alias:  321-type prefabricated highway steel bridge (Bailey Bridge)
Derivative models: CB100, Compact-100, British 321-Type Bailey Bridge.
Truss piece model: Type 321 Bailey Panel
Conventional size of truss piece: 3 meters × 1.4 meters (hole to hole) usually also said: 3 meters X 1.5 meters (side to side)
Maximum span of steel bridge design: 51-meter single-span (if the total length is greater than 51 meters, it can be used as a multi-span continuous beam, and 200-type, GWD-type steel bridge can also be selected)
Standard lane width of steel bridge: 4.2 meters single lane (also can be customized according to customer needs)
Load class: Class 10 for automobiles; Class 15 for automobiles; Class 20 for automobiles; Class 50 for crawlers; Class 80 for trailers; 40 tons for bicycles;
AASHTO HS20, HS25-44, HL93, BS5400 HA + HB; City-A; City-B; Highway-I; Highway-II; Indian standard Class-40; Australian standard T44; Korean standard D24, etc.
Design: 321 type SS, SSR, DS, DSR, TS, TSR, DD, DDR, TD, TDR
According to the difference of span and load, select the appropriate row. Contact us for free design.
Main material of steel bridge: GB Q345B
Connection pin material: 30CrMnTi
Connecting bolt grade: 8.8 high-strength bolts
Surface corrosion: Hot-dip galvanizing; paint; heavy-duty anticorrosive paint for steel structure; asphalt paint; anti-skid aggregate treatment of bridge deck, etc.
Bridge erection method: Cantilever push-out method; hoisting method; floating method; in-situ assembly method; soil pile construction method, etc.
Installation takes time: 7-14 sunny days after the abutment and other conditions are met (determined according to the length of the bridge and site conditions)
Installation requires workers: 6-8 (determined according to site conditions)
Equipment required for installation: Cranes, hoists, jacks, chain hoists, etc. (Can be adjusted according to site conditions)
Steel bridge features: Short delivery time, light fittings, fast assembly, interchangeable, detachable, long life
Pass the certification: ISO, CCIC, BV, SGS, CNAS, etc.
Executive standard: JT-T/728-2008
manufacturer: Zhenjiang Great Wall Heavy Industry Technology Co., Ltd.
Annual output: 12000 tons

Product elements introduction

It consists of Chord member, Montant Diagonal rod.
1. Panel Bridge
2. Factory provided directly
3. Manual handling
bailey bridge panel consists of panels, pins, post end, bolt, chord reinforcement, truss bolt and chord bolt.

Product application

The early Compact-100 Bailey Bridge was mainly used in the military, that is, military steel bridge. Now Compact-100 Bailey Bridge has been widely used in rescue and disaster relief, traffic engineering, municipal water conservancy engineering, dangerous bridge reinforcement, etc. in addition to being a war-ready steel bridge.

Product advantages


Product detail pictures:

New Fashion Design for Compact 200 Bailey Bridge - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall detail pictures

New Fashion Design for Compact 200 Bailey Bridge - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall detail pictures

New Fashion Design for Compact 200 Bailey Bridge - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall detail pictures


Related Product Guide:

We have probably the most state-of-the-art output equipment, experienced and qualified engineers and workers, recognized good quality manage systems plus a friendly skilled income workforce pre/after-sales support for New Fashion Design for Compact 200 Bailey Bridge - Sophisticated Technology of Compact-100 Bailey Bridge – Great Wall , The product will supply to all over the world, such as: Montreal, French, Costa rica, Selling our products causes no risks and brings high returns to your company instead. It is our consistent pursuit to create value for clients. Our company is looking for agents sincerely. What are you waiting for? Come and join us. Now or never.
  • The factory technical staff not only have high level of technology, their English level is also very good, this is a great help to technology communication.
    5 Stars By Gabrielle from Johor - 2018.06.30 17:29
    Managers are visionary, they have the idea of "mutual benefits, continuous improvement and innovation", we have a pleasant conversation and Cooperation.
    5 Stars By Honorio from Plymouth - 2018.12.28 15:18