We depend on sturdy technical force and continually create sophisticated technologies to meet the demand of Longest Walking Suspension Bridge, Bridge Bailey, Temporary Modular Bridge, Our main objectives are to deliver our consumers worldwide with high quality, competitive selling price, satisfied delivery and outstanding providers.
Factory directly supply Steel Joist Bridge - Bailey bridge bearings and baseplate – Great Wall Detail:
Product introduction
Product composition
Type 321 baseplate: The baseplate is used to place the bridge abutment and evenly distribute the load from the bridge abutment on the foundation. Numbers 1, 2, and 3 are engraved on the edge of the baseplate, which respectively indicate the position of the centerline of the bridge abutment for single-row, double-row, and three-row bridges. On the other side of the seat plate is engraved the position of the centerline in the direction of the bridge.
200 type bridge bearing, the baseplate is the same as 321 type, but the structure is a single body, and each bridge bearing corresponds to a baseplate.
Product detail pictures:
Related Product Guide:
From the past few years, our firm absorbed and digested sophisticated technologies equally at home and abroad. Meanwhile, our organization staffs a group of experts devoted into the growth of Factory directly supply Steel Joist Bridge - Bailey bridge bearings and baseplate – Great Wall , The product will supply to all over the world, such as: Las Vegas, Nepal, Madagascar, We strongly believe that technology and service is our base today and quality will create our reliable walls of future. Only we've got better and better quality , could we achieve our customers and ourselves, too. Welcome customers all over the word to contact us for getting further business and reliable relationships. We have been always here working for your demands whenever you require.